| Entrance | Exit | · | Consultancy | References | End |
 

Multi-occupied residential house

Multi-occupied residential house
Multi-occupied residential house [Photo: db]
 
Object data
Heated area: ~540 m².
No of residents: 7-9
 
Work completed
  1. Heating requirement calculated by applying envelope technique.
  2. Design of 4 heating systems with distribution, expansion tanks, pool control.
  3. Renewed the control of the main house
  4. General energy savings consultancy.

Special circumstances
In this remedial project, completed in summer 1998, we rebuilt 4 heating systems, renewed the heating control system of the main buiding, since the two boilers for the underfloor heating and swimming pool / hot water would not function together.
      All heating systems were converted for use of natural gas instead of liquid gas, the hydraulic system was balanced and a new control system for maximum electricity saving was built in.
 
| Entrance | Exit | · | Consultancy | References | Top |

eMail © System Integration Beitzke
Page written 1.12.1998, last update 13:58 27.11.2003, Donnerstag