These are some projects where we saved energy and which we continue to look after as for performance contracting (typical selection):
- A number of remedial projects in words and pictures
- Our long-term heating optimization project
A number of remedial projects in words and pictures
|
2006: Office buiding in Oberforstbach near Aachen
Renewed heating system, hydraulically balanced with bajorath controller.
|
|
|
2006: Stables and residential building in Baden
Renewed heating system with wood-fired boiler, solar energy system planned, heat distribution over distance.
|
|
|
2005: Residential/Office building in Luxemburg
Renewed heating system according to bajorath system.
|
|
|
2003: Multi-occupied residential house in Schleswig-Holstein
Reconstruction of a heating system from the seventies.
|
|
|
2002: Residential estate
The heating contractor was complaining: the efficiency of the heating system is only 86%.
|
|
|
2002: Podere San Domenico
This modernized farmhouse in Casentino is fitted with a wood-fired stove and radiators. A hot water solar system with a buffer was installed and the water supply system was improved.
|
|
|
2002: Group holiday center in Schleswig-Holstein
Reconstruction of seventies-built ventilating and heating systems including hot water.
|
|
|
2001: Appartment house in Dortmund
A rare instance of a landlord investing time and money to save energy for the benefit of his tenants.
|
|
|
2000: Residential house in Mexico
Design of the solar system for heating and hot water.
|
|
|
1998: Die Objekt Gestaltung Design GmbH
Redesign of a factory building with offices and 4 workshops: insulation, remediaton of fassade and 2 heating systems.
|
|
|
1998: Multi-occupied residential house
4 heating systems rebuild, renewed the heating control system of the main buiding, 2 heaters for underfloor heating, pool, hot water coordinated.
|
|
|
1998: Obermühle Aachen ®
In this remedial hotel project, completed in summer 1998, we rebuilt 3 heating systems, renewed the heating control system of the main buiding.
|
|
|
1995: Residential house in Alsdorf
Extension and renovation of this residential house with new heating and solar energy hot water systems and utilisation of rainwater.
|
|
|
1983: Commercial building in Aachen
We looked after this 5-floor commmercial building in Aachen for 7 years, successfully combating the sick building syndrome.
|
[ Contents ]
Nobody loves the optimizer:
If the settings aren't quite correct, everybody whinges.
If they are actually correct, people don't notice -
(but put the savings in their pockets all the same!)
|
Our long-term heating optimization project
Since 1990, we have been keeping an "old" heating system optmized, with our data-gathering system since 1995.
Our optimizing project is at its own website
The economies we made by permanent datalogging by our data capture system led us create the separate website www.heizungsbetrieb.de. Data logging made it possible to show changes and the saving-strategies implemented at the end of the year.
|
Since optimization began, no changes have been made to the house, and the inside temperatur was always 20ºC. It should be remembered that the boiler has to warm the hot water too.
These strategies cut oil costs by about 40%, thus reducing CO2, soot and pollution. The details about how to achieve this cannot be revealed on this site. Look yourself...
(Be careful, its a lot - look for yourself, you may get hooked :-)
|
|